• AASHTO ARRA-2

AASHTO ARRA-2

  • More Projects and Paychecks: Transportation's Summer of Recovery
  • standard by American Association of State and Highway Transporta
  • Category: AASHTO

$190.00 $95.00

5The transportation investment in stimulus is working and in every state across the nation. More than $40 billion in highwayand transit projects have been approved and are moving forward - almost $30 billion are under contract on 16,761 differentprojects. More than 63,000 direct on-project jobs have been created or sustained in August as a result of the American Recoveryand Reinvestment Act and states have already paid out $3.2 billion in payroll.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

AASHTO T 309-15 (2019)

AASHTO T 309-15 (2019)

Standard Method of Test for Temperature of Freshly Mixed Portland Cement Concrete..

$33.00 $66.00

AASHTO T 312-15

AASHTO T 312-15

Standard Method of Test for Preparing and Determining the Density of Asphalt Mixture Specimens by Me..

$48.00 $96.00

AASHTO T 185-15

AASHTO T 185-15

Standard Method of Test for Early Stiffening of Hydraulic Cement (Mortar Method), (ASTM Designation:..

$27.00 $54.00

AASHTO T 105-15

AASHTO T 105-15

Standard Method of Test for Chemical Analysis of Hydraulic Cement (ASTM Designation: C 114-13)..

$30.00 $60.00