• Guide to Preparing a Design Proposal for Paralleling Customer Generation with an Electric Utility

Guide to Preparing a Design Proposal for Paralleling Customer Generation with an Electric Utility

  • Secure PDF Files
  • Handbook / Manual / Guide by National Electrical Manufacturers A
  • Category: NEMA

$78.00 $39.00

Addresses facility electrical systems that must interface with an electric utility company grid in order to purchase power requirements.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

NEMA SSL 6-2010 Errata (2011)

NEMA SSL 6-2010 Errata (2011)

Errata for Solid State Lighting for Incandescent Replacement-Dimming..

$78.00 $156.00

NEMA 410-2011

NEMA 410-2011

Performance Testing for Lighting Controls and Switching Devices with Electronic Drivers and Discharg..

$50.00 $99.00

NEMA LL 9-2011

NEMA LL 9-2011

Dimming of T8 Fluorescent Lighting Systems..

$27.00 $54.00

NEMA XR 27-2012 Errata

NEMA XR 27-2012 Errata

Errata to X-ray Equipment for Interventional Procedures User Quality Control Mode..

$99.00 $197.00