ICC IBC-2021
- 2021 International Building Code
- STANDARD by International Code Council, 2020
- Category: ICC
$156.00
$80.00
- Puzzle rooms (escape rooms) are now defined and regulated as special amusement areas, requiring compliance with Section 411 and special means of egress requirements.
- For the purposes of determining the allowable number of control areas in a building, each portion separated by one or more fire walls is now considered as a separate building.
- In Group E occupancies, enhanced classroom acoustics in compliance with ICC A117.1 are to be provided in all classrooms having of volume of 20,000 cubic feet or less.
- The requirements for metal composite materials and systems (MCM) installed on the exterior walls of Types I, II, III and IV construction were simplified and sprinkler allowances were deleted
- The use of intermodal shipping containers as buildings is now specifically addressed through provisions intended to supplement existing applicable IBC requirements.
- Automatic sprinkler protection is now required in Group S-2 open parking garages where any fire area exceeds 48,000 square feet.
- The 2017 edition of ICC A117.1 was adopted.
- Parapets of a minimum height are now required for aggregate-surfaced roofs to prevent blow-off.
- Mixed occupancy buildings with assembly spaces are placed in Risk Category III when the total public assembly occupant load is greater than 2500 people.
- The 2021IBCsnow map is updated to match ASCE 7-16 snow maps by adding a reference to ASCE 7 snow tables in states with large case study areas.
- Secondary rain loads are updated to be consistent with ASCE 7.
- Special inspection requirements were added to address the anchorage and connection of mass timber structural elements.
- Installation of firestop, fire-resistant joint systems and perimeter fire barrier systems in residential-use buildings now requires special inspection in Group R fire areas having an occupant load exceeding 250 people.
- Frost protection for egress doors was added to the foundation requirements.
- ACI standards ACI 117 and ITG 7 were added by reference to provide acceptable tolerances for concrete construction.
- Three new types of construction (Types IV-A, IV-B, and IV-C) allow mass timber buildings of taller heights, more stories above grade, and greater allowable areas compared to existing provisions for heavy timber buildings.

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

After purchasing, you have the ability to assign each license to a specific user.

At any time, you are permitted to make printed copies for your and your members' reference use.