• IEEE 1727-2013/Cor 1-2015

IEEE 1727-2013/Cor 1-2015

  • IEEE Guide for Working Procedures on Underground Transmission Circuits with Induced Voltage -- Corrigendum 1
  • Corrigenda by IEEE, 02/20/2015
  • Category: IEEE

$185.00 $93.00

Corrigendum Standard - Active.Induced voltage working procedures for underground transmission circuits are established in this guide. A transmission circuit when de-energized will have an induced voltage when in a common duct bank with an energized circuit. The induced voltage may be a possible safety hazard. The induced voltage may be determined by modeling the circuits and by measurement. This guide addresses the working procedures to follow when performing work where induced voltage is present.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

SCTE 246 2018

SCTE 246 2018

Best Practices in Photovoltaic System Operations and Maintenance for Cable System Operator..

$25.00 $50.00

SCTE 16 2018

SCTE 16 2018

Hum Modulation..

$25.00 $50.00

SCTE 245 2018

SCTE 245 2018

Use Cases for Adaptive Power Using APSIS..

$25.00 $50.00

SCTE 173-2 2017

SCTE 173-2 2017

Framework for Implementing Preferential Telecommunications in IPCablecom and IPCablecom2 Networks..

$25.00 $50.00