• IEEE C57.13.1-2006

IEEE C57.13.1-2006

  • IEEE Guide for Field Testing of Relaying Current Transformers
  • standard by IEEE, 02/28/2007
  • Category: IEEE

$81.00 $41.00

Revision Standard - Superseded.This guide describes field test methods that assure that current transformers areconnected properly, are of marked ratio and polarity, and are in a condition to perform asdesigned both initially and after having been in service for a period of time.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

SCTE 82 2012

SCTE 82 2012

Test Method for Low Frequency and Spurious Disturbances..

$25.00 $50.00

SCTE 132 2012

SCTE 132 2012

Test Method For Reverse Path (Upstream) Bit Error Rate..

$25.00 $50.00

SCTE 38-3 2012

SCTE 38-3 2012

Hybrid Fiber/Coax Outside Plant Status Monitoring SCTE-HMS-COMMON-MIB Management Information Base (M..

$25.00 $50.00

SCTE 38-4 2012

SCTE 38-4 2012

Hybrid Fiber/Coax Outside Plant Status Monitoring SCTE-HMS-PS-MIB Management Information Base, (form..

$25.00 $50.00