• ISA 77.41.01-2005

ISA 77.41.01-2005

  • Fossil Fuel Power Plant Boiler Combustion Controls : ISA Standard S77.41
  • standard by The International Society of Automation,
  • Category: ISA

$191.00 $96.00

Formerly S77.41-1992. Establishes minimum requirements for the functional design specification of combustion control systems for drum-type, fossil-fueled power plant boilers. Addresses combustion control subsystems in boilers with steaming capacities of 200,000 lb/hr (25 kg/s) or greater, including (but not limited to) furnace pressure control; air flow control; and fuel flow control when firing coal, oil, gas, or combinations thereof. Specifically excluded from consideration are development of boiler energy demand, all burner control, interface logic systems, and associated systems, as well as all controls associated with fluidized bed and stoker-fired combustion units.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

ISA TR12.13.03-2009

ISA TR12.13.03-2009

Guide for Combustible Gas Detection as a Method of Protection..

$35.00 $69.00

ISA TR77.70.01-2010 (R2015)

ISA TR77.70.01-2010 (R2015)

Tracking and Reporting of Instrument and Control Data..

$42.00 $83.00

ISA 95.00.01-2010

ISA 95.00.01-2010

Enterprise-Control System Integration - Part 1: Models and Terminology..

$255.00 $509.00

ISA 95.00.02-2010

ISA 95.00.02-2010

Enterprise-Control System Integration - Part 2: Object Model Attributes..

$255.00 $509.00