• ISA 77.43.01-2002 (R2008)

ISA 77.43.01-2002 (R2008)

  • Fossil Fuel Power Plant Unit/Plant Demand Development - Drum Type
  • standard by The International Society of Automation, 12/30/2002
  • Category: ISA

$83.00 $42.00

The scope of this document is to address the unit/plant demand development subsystem for boilers withsteaming capacities of 200,000 lbs/hr (25 kg/s) or greater. This subsystem includes firing rate demanddevelopment, throttle/header pressure control, and unit megawatt/steam flow control as applicable.

This document will address two types of process applications:

a) a single boiler supplying a single turbine, typical of an electric utility power plant; and
b) a single boiler or multiple boilers supplying a common distribution header, typical of an industrialpower plant.

Specifically excluded from consideration are:

a) dispatch control;
b) turbine/generator control (other than turbine demand);
c) combustion controls (covered separately by ANSI/ISA-77.41-1992, Fossil Fuel Power Plant BoilerCombustion Controls);
d) steam distribution control systems;
e) economic loading of boilers; and
f) fluidized bed boilers.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

ISA 71.04-1985

ISA 71.04-1985

Environmental Conditions for Process Measurement & Control Systems: Airborne Contaminants..

$28.00 $55.00

ISA 72.01-1985

ISA 72.01-1985

PROWAY-LAN Industrial Data Highway..

$93.00 $185.00

ISA 75.11-1985 (R1997)

ISA 75.11-1985 (R1997)

Inherent Flow Characteristic & Rangeability of Control Valves..

$90.00 $180.00

ISA 5.5-1985

ISA 5.5-1985

Graphic Symbols for Process Displays..

$52.00 $104.00