ISA 77.43.01-2014
- Fossil Fuel Power Plant Unit/Plant Demand Development - Drum Type
- standard by The International Society of Automation, 12/22/2014
- Category: ISA
$83.00
$42.00
This standard will address two types of process applications:
- a) a single boiler supplying a single turbine, typical of an electric utility power plant; and
- b) a single boiler or multiple boilers supplying a common distribution header, typical of an industrial power plant.
- a) dispatch control;
- b) turbine/generator control (other than turbine demand);
- c) feedwater controls
- d) steam temperature controls (covered separately by ANSI/ISA-77.44.01, Fossil Fuel Power Plant - Steam Temperature Controls);
- e) combustion controls (covered separately by ANSI/ISA-77.41.01, Fossil Fuel Power Plant Boiler Combustion Controls);
- f) steam distribution control systems;
- g) economic loading of boilers; and
- h) fluidized bed boilers.
The purpose of this document is to establish the minimum requirements for the functional design specifications of unit/plant demand development for control systems for fossil-fueled power plant boilers.
All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.
After purchasing, you have the ability to assign each license to a specific user.
At any time, you are permitted to make printed copies for your and your members' reference use.