• ISA 77.43-1994

ISA 77.43-1994

  • Fossil Fuel Power Plant Unit - Plant Demand Development, Drum Type : S77.43
  • standard by The International Society of Automation, 04/01/1994
  • Category: ISA

$162.00 $81.00

Formerly S77.43-1994. Addresses the unit/plant demand development subsystem for boilers with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater. This subsystem includes firing rate demand development, throttle/header pressure control, and unit megawatt/steam flow control as applicable. Addresses: (1) a single boiler supplying a single turbine, typical of an electric utility power plant and (2) a single or multiple boiler supplying a common distribution header, typical of an industrial power plant. Specifically excluded are: dispatch control; turbine/generator control (other than turbine demand); combustion controls (covered by ISA-S77.41); steam distribution control systems; economic loading of boilers; and fluidized bed boilers.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

ISA RP 12.13, Part II-1987

ISA RP 12.13, Part II-1987

Installation, Operation, & Maintenance of Combustible Gas Detection Instruments..

$101.00 $201.00

ISA S82.02-1988

ISA S82.02-1988

Safety Standard for Electrical and Electronic Test, Measuring, Controlling, and Related Equipment - ..

$92.00 $183.00

ISA 82.03-1988

ISA 82.03-1988

Safety Standard for Electrical & Electronic Test, Measuring, Controlling & Related Equipment (Electr..

$28.00 $55.00

ISA 12.10-1988

ISA 12.10-1988

Area Classification in Hazardous, Classified, Dust Locations : 12.10..

$35.00 $69.00