ISA 77.70.02-2014
- Fossil Fuel Power Plant Instrument Piping Installation
- standard by The International Society of Automation, 12/15/2014
- Category: ISA
$69.00
$35.00
This standard covers the mechanical design, engineering, fabrication, installation, testing, and protection of fossil power plant instrumentation sensing and control lines. The boundaries of this standard span the process tap root valve to the instrument connection. This standard applies to all fluid media (liquid, gas, or vapor).
Purpose
This standard establishes the applicable installation requirements and limits of instrumentation sensing and control lines and their instruments in fossil power plants.
This standard addresses the requirements of maintaining the pressure boundary integrity of the instrumentation sensing line (in accordance with the appropriate parts of American National Standards Institute [ANSI] standards).
Purpose
This standard establishes the applicable installation requirements and limits of instrumentation sensing and control lines and their instruments in fossil power plants.
This standard addresses the requirements of maintaining the pressure boundary integrity of the instrumentation sensing line (in accordance with the appropriate parts of American National Standards Institute [ANSI] standards).
PDF
All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.
Multi-User Access
After purchasing, you have the ability to assign each license to a specific user.
Printable
At any time, you are permitted to make printed copies for your and your members' reference use.