• NECA 200-2010

NECA 200-2010

  • Recommended Practice for Installing and Maintaining Temporary Electric Power at Construction Sites (ANSI)
  • standard by National Electrical Contractors Association, 2010
  • Category: NECA

$40.00 $20.00

Describes installation procedures for temporary power at construction sites. It covers the planning, installation, expansion, maintenance, cutover, and removal of temporary power systems operating at 600 volts or less. NECA 200 is approved as an American National Standard (ANS).
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

NECA 331-2009

NECA 331-2009

Standard for Building and Service Entrance Grounding and Bonding..

$20.00 $40.00

NECA 408-2009

NECA 408-2009

Recommended Practice for Installing and Maintaining Busways..

$20.00 $40.00

NECA 600-2003

NECA 600-2003

Recommended Practice for Installing and Maintaining Medium-Voltage Cable (ANSI)..

$20.00 $40.00

NECA 700-2010

NECA 700-2010

Recommended Practice for Installing Underground Nonmetallic Utility Duct (ANSI)..

$20.00 $40.00