• NEMA MGRD R2-2018

NEMA MGRD R2-2018

  • State Regulatory and Policy Considerations for Increased Microgrid Deployment
  • standard by National Electrical Manufacturers Association, 2018
  • Category: NEMA

$263.00 $132.00

NEMA conducted a study to evaluate the most significant policy barriers affecting microgrid deployment. Based on successful state regulations and policies, this report includes an analysis of solutions to overcome these barriers.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

NEMA EW 9-2012

NEMA EW 9-2012

Arc Welding Power Sources - Energy Consumption Testing and Labeling..

$32.00 $64.00

NEMA RV 1-2012

NEMA RV 1-2012

Application and Installation Guidelines for Armored Cable (AC) and Metal-Clad (MC) Cable..

$49.00 $97.00

NEMA XR 26-2012

NEMA XR 26-2012

Access Controls for Computed Tomography: Identification, Interlocks, and Logs..

$36.00 $72.00

NEMA XR 27-2012

NEMA XR 27-2012

X-ray Equipment for Interventional Procedures User Quality Control Mode, Includes Errata (2013)..

$69.00 $138.00