• PEI RP400-02

PEI RP400-02

  • Recommended Procedure for Testing Electrical Continuity of Fuel Dispensing Hanging Hardware
  • Recommended Practice by Petroleum Equipment Institute, 2002
  • Category: PEI

$195.00 $98.00

The procedure described in this document is intended for use on gasoline and diesel fuiel-dispensing equipment typically attached to motor vehicle-fueling dispensers. Such dispensers utilize suction or pressure-pumping systems and may or may not include Stage II vapor recovery systems.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

PEI RP900-17

PEI RP900-17

Recommended Practices for the Inspection and Maintenance of UST Systems (2017 Edition)..

$98.00 $195.00

PEI RP100-17

PEI RP100-17

Recommended Practices for Installation of Underground Liquid Storage Systems (2017 Edition)..

$98.00 $195.00

PEI RP1200-17

PEI RP1200-17

Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Second..

$98.00 $195.00

PEI RP400-18

PEI RP400-18

Recommended Procedure for Testing Electrical Continuity of Fuel Dispensing Hanging Hardware..

$98.00 $195.00