• PIP CVS02100

PIP CVS02100

  • Site Preparation, Excavation, and Backfill Specification [Complete Revision]
  • standard by Process Industry Practices, 06/01/2019
  • Category: PIP

$100.00 $50.00

This Practice describes the requirements for excavation, placement, inspection, and management of materials during the site preparation, excavation, and backfill phase of a construction project.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

PIP STS02360

PIP STS02360

Driven Piles Specification [Complete Revision]..

$75.00 $150.00

PIP STS02360-EEDS

PIP STS02360-EEDS

Driven Piles Specification Electronic Entry Data Sheet..

$25.00 $50.00

PIP PLSC0012

PIP PLSC0012

Stringing of Pipelines [New Practice]..

$50.00 $100.00

PIP PLSC0021

PIP PLSC0021

Pressure Testing of ASME B31.8 Metallic Piping [New Practice]..

$50.00 $100.00