• PIP ELSMC12

PIP ELSMC12

  • Low-Voltage Fused Switch Motor Control Centers
  • standard by Process Industry Practices, 03/01/2000
  • Category: PIP

$70.00 $35.00

This Practice provides the requirements for design, fabrication, testing, and handling of low-voltage motor control centers using fused switches that will be installed in chemical plants and petroleum facilities.
The requirements of this Practice apply to factory-assembled 600 V fused switch motor control centers. It includes requirements for buses, enclosures, motor starters, and fused switches. All equipment is suitable for use in dry, non-classified areas or in outdoor enclosures.
Items such as panelboards and adjustable speed drives are outside the scope of this Practice. When such items are to be incorporated into the motor control center, the Buyer will specify the additional requirements.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

PIP RESP004-EEDS

PIP RESP004-EEDS

Liquid Ring Vacuum Pumps and Compressors Specification..

$63.00 $125.00

PIP STE05530

PIP STE05530

Grating Design Guide..

$50.00 $100.00

PIP PCTPS001 (R2017)

PIP PCTPS001 (R2017)

Packaged Equipment Instrumentation Inspection and Testing Requirements Data Sheet [Reaffirmation]..

$25.00 $50.00

PIP PCTPS001-T-EEDS

PIP PCTPS001-T-EEDS

Electronic Entry Data Sheet for Packaged Equipment Instrumentation Inspection and Testing Requiremen..

$63.00 $125.00