• SAE AIR6218

SAE AIR6218

  • Constructing Development Assurance Plan for Integrated Systems
  • standard by SAE International, 10/22/2018
  • Category: SAE

$81.00 $41.00

This SAE Aerospace Information Report (AIR) supplements ARP4754A by identifying the crucial elements to be considered when constructing the development assurance plans described in Chapter 3 (Development Planning) of ARP4754A for integrated systems. This AIR presents a collection of lessons learned from past certification programs involving integrated systems. This AIR is not guidance for system integration technologies.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

SAE AS85848/2A

SAE AS85848/2A

SLEEVING, FOR IDENTIFICATION MARKING HEAT SHRINKABLE, POLYVINYLIDENE FLUORIDE, FLEXIBLE (Stabilized:..

$41.00 $81.00

SAE AS9575D

SAE AS9575D

BOLT, MACHINE - DOUBLE HEXAGON EXTENDED WASHER HEAD, DRILLED, PD SHANK, SILVER PLATED, CORROSION AND..

$41.00 $81.00

SAE AMS4031J

SAE AMS4031J

Aluminum Alloy, Sheet and Plate 6.3Cu - 0.30Mn - 0.18Zr - 0.10V - 0.06Ti (2219-O) Annealed or when s..

$41.00 $81.00

SAE AMS2375E

SAE AMS2375E

Control of Forgings Requiring First Article Approval..

$41.00 $81.00