• SCTE 38-2 2017

SCTE 38-2 2017

  • Hybrid Fiber/Coax Outside Plant Status Monitoring SCTE-HMS-ALARMS-MIB Management Information Base (MIB) Definition
  • standard by Society of Cable Telecommunication Engineers, 2017
  • Category: SCTE

$50.00 $25.00

This document is identical to SCTE 38-2 2011 except for informative components which may have been updated such as the title page, NOTICE text, headers and footers. No normative changes have been made to this document.
This document defines the historical list of alarms detected by the transponder, as well as the SNMP trap generated for these alarms.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

SCTE 70 2002 (R2007)

SCTE 70 2002 (R2007)

Insulation Resistance Megohmmeter Method..

$25.00 $50.00

SCTE 51 2007

SCTE 51 2007

Method for Determining Drop Cable Braid Coverage..

$25.00 $50.00

SCTE 49 2007

SCTE 49 2007

Test Method for Velocity of Propagation..

$25.00 $50.00

SCTE 45 2007

SCTE 45 2007

Test Method for Group Delay..

$25.00 $50.00