• SCTE 51 2012

SCTE 51 2012

  • Method for Determining Drop Cable Braid Coverage
  • standard by Society of Cable Telecommunication Engineers, 09/01/
  • Category: SCTE

$50.00 $25.00

The purpose of this document is to provide instruction on the calculation of braid coverage for braided coaxial drop cables. Braid coverage is expressed as a percentage of optical coverage of the underlying core by the braid wires.
PDF

All of our standards document are available in PDF (Portable Document Format), an electronic, downloadable format.You will be able to download the file in your account downloads.

Multi-User Access

After purchasing, you have the ability to assign each license to a specific user.

Printable

At any time, you are permitted to make printed copies for your and your members' reference use.

SCTE 83-4 2017

SCTE 83-4 2017

HMS Common Inside Plant Management Information Base (MIB). SCTE-HMS-HE-RF-MIB..

$25.00 $50.00

SCTE 84-1 2017

SCTE 84-1 2017

HMS Common Inside Plant: Management Information Base (MIB) Part 1: SCTE-HMS-HE-COMMON-MIB..

$25.00 $50.00

SCTE 84-2 2017

SCTE 84-2 2017

HMS Inside Plant Management Information Base (MIB) SCTE-HMS-HE-POWER-SUPPLY-MIB..

$25.00 $50.00

SIA DC-01-1988 (R2001)

SIA DC-01-1988 (R2001)

Digital Communications Technical Report - Receiver-to-Computer Interface Protocol (Type 1) - for Cen..

$30.00 $60.00